Colours

Leviathan's Blog, Version 13

It is probably the worst disruption of train services since a train crash at Clementi in 1993 - a stalled, damaged maintenance train crippled train services between Pasir Ris and Tanah Merah, leaving over 50,000 commuters stranded and late for work and school. The more incredulous part - train services were suspended from beginning of operations till before 1pm.

In the second disruption in a month, a damaged maintenance train which was carrying out repairs stalled in the wee hours of the morning. Somehow, the problem wasn't rectified till train services began rolling in. And, as many people have criticised the mismanagement at SMRT (check out Stomp), replacement bus services did not come in till it was peak hours and of course concocted a recipe for a morning transportation disaster. Train services only resumed some six hours later at 12.45pm. Among some of the more hot-headed (and radical, probably?) comments include how SMRT was the "first to increase fares" but not the service, and how the "entire management" should be "sacked". Ironically, it is now imperative that the maintenance trains really need to be maintained.

Perhaps after the supposed overhaul of the bus system based on the study conducted by the Land Transport Authority, it is high-time the train system and more importantly, the management of the system, should be reviewed, so much so not to besmirch the honorary title of "world-class transportation" further.

0 Response for the "Incredulous Mess-up"

    Interaction

    Friends